A small stream by summer, a raging torrent in winter – this project pushed our skill sets to their limit. Our challenge, to stop the stream from eroding away the base of The Bridge Inn in Grinton and the adjacent car park.

We had to divert the river using temporary pipework to enable a firm concrete riverbed from one side of the existing riverbed to the other and reverse to enable the whole riverbed to be relined.

Bad weather, rising winter water levels we had everything but we did it! And secured the pub for the foreseeable future against mother nature!

This site uses cookies. Cookies are used for core functionality and for ads personalisation.
By continuing your visit, you accept their use as set out in our Privacy and Cookie Policy.
Accept All Cookies Cookie Preferences

Sorry, this item is currently out of stock.
We currently hold [remaining-stock] units of this item in stock. The remainder will be put on back order.
You cannot order more of this item than we currently hold in stock.
You must order at least [min-order-qty] of this product.
You must order at least [min-order-qty] of this product. We currently hold [remaining-stock] in stock. The remainder will be put on back order.