A small stream by summer, a raging torrent in winter – this project pushed our skill sets to their limit. Our challenge, to stop the stream from eroding away the base of The Bridge Inn in Grinton and the adjacent car park.
We had to divert the river using temporary pipework to enable a firm concrete riverbed from one side of the existing riverbed to the other and reverse to enable the whole riverbed to be relined.
Bad weather, rising winter water levels we had everything but we did it! And secured the pub for the foreseeable future against mother nature!